
For Business
Hospitality spaces that start earning sooner.
Scalable accommodation for glamping, campsites, boutique hotels and nature resorts.
8weeks
production time
60–70%
less on-site labour
up to90%
less construction waste
6–10units
for a first phase
Labour and waste figures: per EU/Eurostat-based estimates, Moduliva market research 2026.
The numbers behind a project
Illustrative revenue case
Illustrative only
A 10-key nature retreat, accommodation revenue only.
10
×365
×48%
×€145
=€254,040
units
nights
occupancy
rate/night
per year
10 units × 365 nights × 48% occupancy = 1,752 occupied nights × €145
Concept unit mix: 2 Mover 26, 4 Moduliva 32 and 4 Moduliva 48.
Illustrative only. Excludes land, infrastructure, VAT, financing, payroll, utilities, maintenance, taxes and OTA commissions. No investment outcome is guaranteed.
~169days
is the average wait for a building permit in the EU. A Moduliva unit takes 8 weeks to produce.
~26%
of EU land is under environmental protection, and Moduliva units can still be installed there.
Per EU/Eurostat-based estimates, Moduliva market research 2026.
Request a Project ReviewA portfolio built around hospitality use cases.
The three models share one building logic, so a single site can combine them to suit its guests.

Visualisation
Mover 26
2–3 guests, 26 m²
Movable unit
Best for: Glamping operators, seasonal destinations, guest accommodation, private retreats, mobile-living customers

Moduliva 32
2–4 guests, 32 m²
Flagship model
Best for: Couples, small families, holiday homes, premium glamping suites, boutique hospitality projects

Visualisation
Moduliva 48
4–6 guests, 48 m²
Best for: Families, groups of friends, premium holiday homes, resort villas, high-capacity glamping accommodation

One system, multiple hospitality strategies.
Campsites
Upgrade selected pitches with premium, four-season accommodation.
Glamping
Launch a differentiated nature concept and expand by phase.
Boutique hotels
Add detached suites with limited disruption to existing guests.
Wellness resorts
Create private units with sauna, hot tub and terrace options.
Rural landowners
Develop a small destination before committing to full scale.
Corporate retreats
Combine accommodation with shared meeting and social spaces.
Sense Lounge, Moduliva's own experience concept, is the demo location behind this system. About Sense Lounge

Demo location
See it in person
A Moduliva 32 is waiting at our demo location between Lovech and Troyan. Walk through it, feel the materials and picture your own project.
Book a visitA controlled route from concept to guest-ready accommodation
Moduliva combines product, design coordination and deployment into one scalable accommodation system.
Activate sooner
Factory production can run in parallel with site preparation.
Invest in phases
Add keys as demand and occupancy are proven.
Standardize quality
Repeatable specifications create a consistent guest product.
Operate simply
Shared components and smart controls reduce operational complexity.
Grow capacity against proven demand.
An illustrative three-stage development logic.
Phase 1
Validate
- 6–10 accommodation units
- Core utilities + arrival experience
- Open and test demand
Phase 2
Deepen
- Add family units
- Wellness + food experience
- Increase length of stay
Phase 3
Scale
- Premium villas
- Corporate or event facilities
- Complete destination offer
Hospitality development is often slowed by the wrong risks.
Time
Long sequential construction delays opening and revenue.
Cost
Multiple contracts and variations weaken budget control.
Capacity
Building the full resort at once exposes capital before demand is proven.
Operations
One-off rooms, systems and finishes create maintenance complexity.
Moduliva shifts critical work into a controlled factory process.
| Aspect | Conventional delivery | Moduliva approach |
|---|---|---|
| Workflow | Predominantly sequential | Factory + site work in parallel |
| Weather exposure | High during construction | Limited during production |
| Cost control | Multiple contracts and variations | Defined unit specification |
| Expansion | Disruptive and capital-heavy | Phased module deployment |
| Quality | Varies by site team | Repeatable production process |
| Opening | Usually after full construction | Potential for phased operation |
Site preparation and module production move forward together.
- 1Site + business assessment
- 2Concept + unit mix
- 3Technical coordination
- In parallel
- 4Factory production
- 5Site + utilities
- 6Transport + installation
- 7Handover + operation
The exact programme depends on model, order volume, site readiness, permits and logistics.

Start with the site.Design the business.Then define the space.
A Moduliva feasibility review can define:
- Indicative site capacity and unit mix
- Phasing and infrastructure logic
- Recommended accommodation specification
- Preliminary investment boundaries
- Delivery pathway and next decisions
Or write to us at [email protected]